Meet regulatory Demands: UK Engineering Recommendation G99
Problem
The peak consumption of on-site EV chargers is higher than grid connection. According to G99, the site must demonstrate capability to limit grid import.
Sparkion Power
Apply maximum import control, which limits site grid import to a specific value by limiting all chargers equally.
Result
Site meets regulatory grid requirements with minimal impact on customer experience.